1/5

ALCH0075 - ROBO Series High Quality 10W AC230V-50Hz adjustable spotlights ceiling

Quick Details
Product Code:
ALCH0075
OEM:
Available
Sample:
Available
Port:
YANTIAN Port
Payment:
VISA,MasterCard,Western Union,L/C,T/T,D/P,D/A,Other
Place of Origin:
China
Shipping:
Support Express · Sea freight · Land freight · Air freight
Supply Ability:
100000 piece per month
Quick Details
OK
Shipping fee
Shipping fee
Inquiry Basket
Contact Supplier
ALCH0075-12.jpg
Product Name
Recessed Downlight
  CRI Ra≥92
Light Source COB CCT 2700/3000/4000K
Brand ALPHALUCE Beam angle 15°/24°/36°
Model Number  ALCH0075 Working Lifetime 40000hrs
lnput Voltage(V) AC230V-50Hz Color Texture White/Texture Black
Lamp Luminous Flux(lm) 780lm Lamp Body Material Alumimum alloy
Lamp Power(w) 10W Warranty(Years) 3-Year
lnstallation
Recessed
Certification CE,EMC,RoHS,VDE,LVD
IP Rating 20 Place of Origin Guangdong,China
1.jpgQQ截图20221018165737.png
2(1).jpgALCH0075.jpg
 
Cilck here for more detailed info. of this family.

ROBO Lighting UGR-10详情页眩光对比图-ALPHALUCE.jpg
灯光设计说明图.jpg

FAQ

1. When can I get the quotation?

    If any items get your interest, please send feedback to our email or chat on trade manager. We usually quote within 12 hours after getting your inquiry. If you are having a very urgent project that needs our quick response, please call us or tell us in your email so that we will regard your inquiry a priority.

 2. How can I get a sample for quality check?

   After price confirmation, you can require samples to check our quality.
If you need samples, we will charge the sample cost. But the sample cost can be refunded after order confirmation if the quantity can exceed our MOQ.

 3. Can you provide OEM or ODM service?

   Yes, we do provide OEM and ODM services cause have a professional team having rich experience in the lighting field. Just tell us your ideas, and we will carry out into perfect lighting solutions. And at present, we are doing ODM business with some famous European brands which assisted them won their market.

4. What’s the lead time for mass production?

   It depends on the order quantity and the reason you place the order. Our usual practice is around 30-35 days after the deposit payment. And we suggest that you start the inquiry two months before the date you would like to receive the goods.

 5. What are the terms of delivery?

   We accept EXW, FOB, CIF, etc. You could choose one of the most convenient and cost-effective ones for you.

Question & Answer